27/05/2025 | 1216 |
0 Review(s)

Long Long Rubber Recycling is a top-tier tire recycling factory in Vietnam, specializing in collecting, processing, and transforming waste tires into high-quality recycled rubber products. With a mission to protect the environment and promote the circular economy, Long Long has become a trusted partner for businesses in various industries, including tire manufacturing, gym flooring, rubber mats, conveyor belts, and more.

Why Recycle Waste Tires?

Waste tires are among the most difficult industrial wastes to decompose, taking hundreds of years to break down in nature. Improper disposal of used tires can lead to serious soil, water, and air pollution. Recycling tires not only helps reduce landfill waste but also provides raw materials for other industries, conserving natural resources and reducing CO₂ emissions.

tire recycling factory in Vietnam

 

Tire Recycling Process at Long Long

At Long Long, the tire recycling process is conducted using advanced technology under strict quality control. The main steps include:

  1. Collection & Sorting: Tires are collected from scrap yards, auto garages, and tire manufacturers nationwide.
  2. Pre-processing: The tires are shredded, and materials such as steel wires and fabric are removed.
  3. Fine Grinding: The rubber is ground into granules or powder, depending on the end-product requirements.
  4. Reuse & Manufacturing: The recycled rubber material is then used to produce rubber tiles, rubber mats, reclaimed rubber, and various OEM rubber products tailored to customer needs.

tire recycling factory in Vietnam

 

Our Recycled Rubber Products

Long Long offers a wide range of recycled rubber products, including:

  • Rubber Tiles: Ideal for playgrounds, gyms, and public areas—non-slip and impact-absorbing.
  • Rubber Mats: Used in industrial and sports settings.
  • Vibration Isolation Strips (Vibrostrip): Commonly used in construction and heavy industries.
  • Reclaimed Rubber Material: Supplied to manufacturers of tires, shoe soles, conveyor belts, and more.

tire recycling factory in Vietnam

 

Why Partner with Long Long?

  • Modern Recycling Facility: We apply cutting-edge tire recycling technologies to ensure efficient and sustainable processing.
  • Consistent Quality: Our products meet international standards for durability and safety.
  • OEM Flexibility: We provide OEM manufacturing tailored to your specifications.
  • Global Export Experience: Long Long has successfully partnered with clients across Asia, Europe, and North America.

tire recycling factory in Vietnam

 

Our Commitment to a Greener Future

Beyond production efficiency, Long Long is committed to minimizing environmental impact. Every year, we recycle thousands of tons of scrap tires, helping reduce rubber waste in the environment and advancing green growth and sustainable development.

If you're looking for a reliable tire recycling factory in Vietnam or want to partner in producing recycled rubber products, Long Long Rubber Recycling is your trusted choice.

📞 Contact us today for a quote or consultation:
🌐 https://longlongrubber.com.vn/
📧 Email: longlong@longlongchem.com
📍 Factory Address: https://maps.app.goo.gl/Ximc5iRksph9cwBE7


(*) main.post_related_heading

Comment
0